Back To Projects

Waha Pipeline

(COMANCHE TRAILS AND TRANSPECOS)

Leveraging the largest owned fleet of modern pipeline equipment and drawing from 30 years of pipeline construction expertise, Pumpco successfully constructed 340 miles of 42″ pipeline for Comision Federal de Electricidad (CFE Mexico). The challenges posed by the large diameter pipe, international relationships, and challenging terrain have significantly enhanced the knowledge and capabilities of the Pumpco Team. This valuable experience has positioned Pumpco to play a pivotal role in forthcoming large-scale international pipeline endeavors.

Client Energy Transfer

Length 337 miles of 42"

Location Coyanosa, Texas – Presidio, Texas

Year 2016

Construction Duration 8 Months